Henry Construction to build £32m Ealing resi scheme

Henry Construction is set to start work shortly on a £32m residential scheme in Ealing, North-West London.

The move follows a £19m funding deal with specialist real estate development finance provider Maslow Capital to support Henry who are acting as developer and contractor.

The scheme on Greenford Road will comprise a part 14- storey, part 5-storey and part 3-storey residential building that will accommodate 83 flats.

Redevelopment of the site will involve the demolition of an existing petrol station.

Charles Leigh, Development Director at Henry Construction said: “We are delighted to have closed  this transaction with Maslow, which will enable us to build and deliver much needed high-quality  housing for the London Borough of Ealing.

“I look forward to continuing our relationship with  Maslow throughout the construction period, and on future projects.”

50 firms win £3.6bn National Highways renewals deal

National Highways has selected 50 supply chain partners to carry out up to £3.6bn worth of renewals to keep England’s motorways and major A roads running safely and smoothly.

Award values vary between £1m and £144m, highlighting how the framework enables SMEs to operate side by side with larger companies.

The new Scheme Delivery Framework replaces the soon to expire existing contract mechanisms, known as the Construction Works Framework (CWF), Design Services Contracts (DSC) and Asset Support Contract (ASC).

The framework is split into four bands:

Band A – Civil Engineering and DrainageBand B – Temporary Traffic Management and Road Restraint SystemsBand C – Specialist worksBand D – Design

Scheme Delivery Framework

 

SOUTH EAST
Band
Sublot
Name
Location
1st Place Supplier
2nd Place SupplierA1.1/SGeneral Civil Engineering Super RegionSouthEurovia InfrastructureMJ Church PlantA1.2/SEGeneral Civil EngineeringSouth EastJackson Civil Engineering GroupA2/SEDrainageSouth EastInterserve ConstructionB3.1/STraffic Management Super RegionSouthH W Martin (Traffic Management)Chevron Traffic ManagementB3.2/SETraffic ManagementSouth EastKier HighwaysB4.1/SRoad Restraint Systems Super RegionSouthForest Traffic ServicesH W Martin (Traffic Management)B4.2/SERoad Restraint SystemsSouth EastR&W Civil EngineeringC5/3Landscape & EcologyArea 3A ConesPJ ChaffinC5/4Landscape & EcologyArea 4A ConesPJ ChaffinC6/SERoad MarkingsSouth EastWJ NorthWilson & Scott (Highways)C7/3Road Lighting & ElectricalArea 3Mway CommunicationsMason Street FurnitureC7/4Road Lighting & ElectricalArea 4Mway CommunicationsMason Street FurnitureC8/3Structures, Waterproofing & Expansion JointsArea 3Route One InfrastructureMetrail constructionC8/4Structures, Waterproofing & Expansion JointsArea 4Winvic ConstructionUniversal SealantsC9/3Technology (inc Traffic Signals)Area 3J. McCann & Co (Nottm)VVB EngineeringC9/4Technology (inc Traffic Signals)Area 4Mway CommunicationsVVB EngineeringC10/3Structures, Structural Services & Concrete RepairsArea 3VolkerLaserWinvic ConstructionC10/4Structures, Structural Services & Concrete RepairsArea 4VolkerLaserFreyssinetC11/4Cathodic ProtectionArea 4VolkerLaserD12.1/SEDesign ServicesSouth EastJacobs Engineering UKD12.2/SDesign Services Super RegionSouthWSP UK
MIDLANDS
Band
Sublot
Name
Location
1st Place Supplier
2nd Place SupplierA1.1/CGeneral Civil Engineering Super RegionCentralMorgan SindallCarnell Support ServiceA1.2/MGeneral Civil EngineeringMidlandsNorth Midland ConstructionA2/MDrainageMidlandsGalliford Try HighwaysB3.1/CTraffic Management Super RegionCentralChevron Traffic ManagementNo Supplier – Contingency in placeB3.2/MTraffic ManagementMidlandsKier HighwaysB4.1/CRoad Restraint Systems Super RegionCentralAmalgamated ConstructionColasB4.2/MRoad Restraint SystemsMidlandsJoe Roocroft and sonsC5/MLandscape & EcologyMidlandsAconesAC Landscapes & Treeworks UKC6/MRoad MarkingsMidlandsWJ NorthWilson & Scott (Highways)C7/7Road Lighting & ElectricalArea 7J. McCann & Co (Nottm)Crown HighwaysC7/9Road Lighting & ElectricalArea 9J. McCann & Co (Nottm)Crown HighwaysC8/7Structures, Waterproofing & Expansion JointsArea 7Route One Infrastructuremetrail constructionC8/9Structures, Waterproofing & Expansion JointsArea 9Route One InfrastructureVolkerLaserC9/7Technology (inc Traffic Signals)Area 7Crown HighwaysMason Street FurnitureC9/9Technology (inc Traffic Signals)Area 9J. McCann & Co (Nottm)Mway CommunicationsC10/7Structures, Structural Services & Concrete RepairsArea 7BalvacVolkerLaserC10/9Structures, Structural Services & Concrete RepairsArea 9Concrete RepairsVolkerLaserC11/7Cathodic ProtectionArea 7Concrete RepairsC11/9Cathodic ProtectionArea 9Concrete RepairsVolkerLaserD12.1/MDesign ServicesMidlandsAmey OWD12.2/CDesign Services Super RegionCentralJacobs Engineering UK
SOUTH WEST
Band
Sublot
Name
Location
1st Place Supplier
2nd Place SupplierA1.1/SGeneral Civil Engineering Super RegionSouthEurovia InfrastructureMJ Church PlantA1.2/SWGeneral Civil EngineeringSouth WestDyer & ButlerA2/SWDrainageSouth WestNorth Midland ConstructionB3.1/STraffic Management Super RegionSouthH W Martin (Traffic Management)Chevron Traffic ManagementB3.2/SWTraffic ManagementSouth WestForest Traffic ServicesB4.1/SRoad Restraint Systems Super RegionSouthForest Traffic ServicesH W Martin (Traffic Management)B4.2/SWRoad Restraint SystemsSouth WestR&W Civil EngineeringC5/SWLandscape & EcologySouth WestA ConesAC Landscapes & Treeworks UKC6/SWRoad MarkingsSouth WestWJ NorthWilson & Scott (Highways)C7/SWRoad Lighting & ElectricalSouth WestMway CommunicationsSSE Enterprise ContractingC8/SWStructures, Waterproofing & Expansion JointsSouth WestMetrail constructionUniversal SealantsC9/SWTechnology (inc Traffic Signals)South WestMway CommunicationsNo Supplier – Contingency in placeC10/SWStructures, Structural Services & Concrete RepairsSouth WestConcrete RepairsFreyssinetD12.1/SWDesign ServicesSouth WestAmey OWD12.2/SDesign Services Super RegionSouthWSP UK
EAST
Band
Sublot
Name
Location
1st Place Supplier
2nd Place SupplierA1.1/CGeneral Civil Engineering Super RegionCentralMorgan SindallCarnell Support ServiceA1.2/EGeneral Civil EngineeringEastJohn Graham ConstructionA2/EDrainageEastVolkerfitzpatrickB3.1/CTraffic Management Super RegionCentralChevron Traffic ManagementNo Supplier – Contingency in placeB3.2/ETraffic ManagementEastForest Traffic ServicesB4.1/CRoad Restraint Systems Super RegionCentralAmalgamated ConstructionColasB4.2/ERoad Restraint SystemsEastJoe Roocroft and sonsC5/ELandscape & EcologyEastPJ ChaffinGround ControlC6/ERoad MarkingsEastWilson & Scott (Highways)No Supplier – Contingency in placeC7/ERoad Lighting & ElectricalEastMason Street FurnitureVVB EngineeringC8/EStructures, Waterproofing & Expansion JointsEastWinvic ConstructionUniversal SealantsC9/ETechnology (inc Traffic Signals)EastCrown HighwaysMason Street FurnitureC10/EStructures, Structural Services & Concrete RepairsEastBalvacWinvic ConstructionD12.1/EDesign ServicesEastWSP UKD12.2/CDesign Services Super RegionCentralJacobs Engineering UK
NORTH WEST
Band
Sublot
Name
Location
1st Place Supplier
2nd Place SupplierA1.1/NGeneral Civil Engineering Super RegionNorthOsborne InfrastructureGalliford Try HighwaysA1.2/NWGeneral Civil EngineeringNorth WestA E YatesA2/NWDrainageNorth WestDyer & ButlerB3.1/NTraffic Management Super RegionNorthTarmac TradingH W Martin (Traffic Management)B3.2/NWTraffic ManagementNorth WestPremier Traffic ManagementB4.1/NRoad Restraint Systems Super RegionNorthColasJoe Roocroft and sonsB4.2/NWRoad Restraint SystemsNorth WestAmalgmated ConstructionC5/10Landscape & EcologyArea 10Green Valley ArboristsGround ControlC5/13Landscape & EcologyArea 13AC Landscapes & Treeworks UKGreen Valley ArboristsC6/NWRoad MarkingsNorth WestWJ NorthPremier RoadmarkingsC7/NWRoad Lighting & ElectricalNorth WestJ. McCann & Co (Nottm)Crown HighwaysC8/10Structures, Waterproofing & Expansion JointsArea 10Winvic ConstructionVolkerLaserC8/13Structures, Waterproofing & Expansion JointsArea 13Route One InfrastructureVolkerLaserC9/10Technology (inc Traffic Signals)Area 10J. McCann & Co (Nottm)Mason Street FurnitureC9/13Technology (inc Traffic Signals)Area 13Crown HighwaysTelent Technology ServicesC10/10Structures, Structural Services & Concrete RepairsArea 10Concrete RepairsWinvic ConstructionC10/13Structures, Structural Services & Concrete RepairsArea 13BalvacFreyssinetD12.1/NWDesign ServicesNorth WestWSP UKD12.2/NDesign Services Super RegionNorthKier HighwaysNORTH EAST
Band
Sublot
Name
Location
1st Place Supplier
2nd Place SupplierA1.1/NGeneral Civil Engineering Super RegionNorthOsborne InfrastructureGalliford Try HighwaysA1.2/NEGeneral Civil EngineeringNorth EastInterserve ConstructionA2/NEDrainageNorth EastCarnell Support ServiceB3.1/NTraffic Management Super RegionNorthTarmac TradingH W Martin (Traffic Management)B3.2/NETraffic ManagementNorth EastPremier Traffic ManagementB4.1/NRoad Restraint Systems Super RegionNorthColasJoe Roocroft and sonsB4.2/NERoad Restraint SystemsNorth EastAmalgamated ConstructionC5/12Landscape & EcologyArea 12Green Valley ArboristsGround ControlC5/14Landscape & EcologyArea 14AC Landscapes & TreeworksGreen Valley ArboristsC6/NERoad MarkingsNorth EastPremier RoadmarkingsJointlineC7/12Road Lighting & ElectricalArea 12J. McCann & Co (Nottm)Crown HighwaysC7/14Road Lighting & ElectricalArea 14Mway CommunicationsMason Street FurnitureC8/NEStructures, Waterproofing & Expansion JointsNorth EastWinvic ConstructionMetrail constructionC9/12Technology (inc Traffic Signals)Area 12J. McCann & Co (Nottm)Mway CommunicationsC9/14Technology (inc Traffic Signals)Area 14Crown HighwaysMason Street FurnitureC10/12Structures, Structural Services & Concrete RepairsArea 12Concrete RepairsWinvic ConstructionC10/14Structures, Structural Services & Concrete RepairsArea 14BalvacFreyssinetD12.1/NEDesign ServicesNorth EastJacobs Engineering UKD12.2/NDesign Services Super RegionNorthKier Highways

Around 23% of the overall framework value has been awarded to SMEs, so creating a secure pipeline of work and increasing innovation across the board.

Redrow happy for staff to keep working from home

Redrow is happy for its 2,300 staff to continue working “where they are most efficient.”

The house building giant confirmed an extension of flexible working practices in its latest annual results.

Group Chief Executive Matthew Pratt said:  “We have also introduced flexible working and many colleagues have been working from home during the pandemic.

“This has proved to be very effective and, going forward; colleagues will be able to work from where they are most efficient, whether that be at home, site or within divisional offices.”

Did you miss our previous article…
https://www.thegraduatemag.com/?p=393

Robert Jenrick exits as housing secretary in cabinet reshuffle

Housing secretary Robert Jenrick has been sacked from his role as Boris Johnson carries out his cabinet reshuffle today.

Jenrick was appointed just over two years ago, replacing James Brokenshire, and at 37 became the youngest member of the Cabinet,

It has not been announced who will replace him.

He tweeted: “It’s been a huge privilege to serve as Secretary of State @mhclg.

“Thank you to everyone at the department for their hard work, dedication and friendship. I’m deeply proud of all we achieved.

“I will continue to support the Prime Minister and the Government in every way I can.”

Fire hits £120m Tolent Milburngate site

Firefighters battled a blaze on Wednesday afternoon at the £120m Milburngate development in Durham being built by Tolent.

County Durham & Darlington Fire & Rescue said the blaze broke out in a cavity wall.

Eight crews tackled the blaze which also led to nearby road closures in the city centre throughout the day.

Tolent is delivering the first phase of the mixed-use development where the structural steel frame reached completion in March.

The contractor said the site was safely evacuated.

Andy Mills, 49, a curtain wall installer who had been working on the site told the Sunderland Echo: “All of a suden it just went ‘whoosh’ with massive black clouds of smoke. We were on the third floor, the alarm had been sounded by then so we ran out to get to the muster point.

“It happened so quickly, it was unreal. I’ve never seen anything like it how fast it went up, really fast. We couldn’t breathe when running down the stairs and had to cover our faces. Luckily enough everyone I know got out safely.”

Phase One of the scheme is due for completion in the first quarter of 2022.

Did you miss our previous article…
https://www.thegraduatemag.com/?p=383

BAM Nuttall chief to exit after 16 months in role

Adrian Savory, BAM Nuttall’s chief executive, is stepping down at the end of the month to pursue other opportunities outside of the business.Savory spent just 14 months in the top job after around 26 years with BAM Nuttall.For the time being he is to be replaced by Ian Parish, managing director of Major Projects, who takes the role of interim MD.

Savory (left) moves on after 26 years  at Nuttall with Ian Parish taking up interim role as MD

Ruud Joosten, CEO of Royal BAM Group, said: ‘We would like to thank Adrian Savory for his service and commitment to BAM over the last 26 years.

“He has held various roles in the company during this time and contributed to its success and growth. We wish him every success in his future career.”

Management team from October

Ian Parish (Interim Managing Director); Martin Bellamy (Managing Director, Regions); Alan Cox (Managing Director, Transport); Ian Phillpot (Finance Director); Richard Reddell (Commercial Director); Richard Lewis (People and Performance Director) and David McGowan (Business Excellence Director).

Did you miss our previous article…
https://www.thegraduatemag.com/?p=382

Vac UK unveils “Ferrari of the vacuum excavation world”

Specialist Vac UK has unveiled the latest Longo Rhino Vacuum Excavator with the new additions to its fleet currently being rolled out on sites across the country.

The machines are the most powerful twin fan suction excavator on the market producing a flow rate of 45,000 m³/h and a vacuum up to 600 mbar. Each is equipped with the latest features including 360 degree cameras, mega power arms and vibrating skips.

Vac UK secured the exclusive rights to distribute specialist Italian manufacturer Longo in the UK and Ireland this year.

Patrick Curran, Vac UK director, said: “The additional power is a key factor adding to the versatility of the Longo.

“When it is used, vac ex already offers a safer, more sustainable, cost-effective alternative to traditional excavation methods. The increased power only adds to the breadth of applications.

“We are seeing very strong demand from our customer base across major civil engineering, utilities and construction companies and from the public sector. Quite rightly, their expectation is for top class kit, great reliability and value for money and the Longo is consistently delivering.

“At Vac UK we have a set out a clear policy of making available for hire and sale only the most high tech and best quality vac ex machines. To that end, and in response to demand, we have a further 15 machines on order.

“These machines have been described as the Ferraris of vacuum excavation. In fact, the connection with the famous Italian brand runs deeper still: the Longo is used to clear Ferrari’s test tracks at its Modena factory.”

 

Did you miss our previous article…
https://www.thegraduatemag.com/?p=381

Createmaster launches Fire and Emergency File

Software specialist Createmaster has launched its latest service extension in response to the introduction of new Building Safety legislation.

The Fire and Emergency File (FEF) provides specific compliance for all buildings designated Higher-Risk Residential Buildings (HRRBs) over 18 meters in height or containing more than six storeys for the new information required to be available between Gateways 2/3.

Gateways 2 and 3 are the main risk transfer points, where responsibility for the new building is passed to the owner/occupier after the construction phase.

The FEF is a structured digital template which enhances Createmaster’s existing online platform by enabling the creation of a complete, accurate and reliable as-built record of fire safety and other emergency systems installed for HRRBs.

To be completed ahead of gateway 3, it is subsequently passed, along with the O&Ms, to the end client at Practical Completion.

The FEF has been developed in collaboration with leading housing association clients and industry consultants, and according to the best practice policy guidance, embodied in the new Building Safety Regulations.

Fundamentally, the Createmaster FEF service solution simplifies the provision of crucial fire safety information, supplementing the requirements of existing Reg 38, the updated Fire Safety Act and the Building Safety Bill (BSB).

Createmaster’s FEFs supports the collation of a critical information bank, which ensures anyone carrying out design, construction or refurbishment work on a building has a complete and accurate record of the fire strategy and systems for the building and its residents.

Importantly, FEFs provide the future building owner and manager with the base construction information to help them understand what protective systems are in use in the building. This will enable them to formulate the “in-use” operation, maintenance & emergency procedures necessary to create a safe environment for all.

In the wake of the Fire Safety Act and the newly introduced Gateways, FEFs will be a required Gateway 3 item for all HRRBs, and one of the core information deliverables of the future Building Safety Case.

Createmaster Managing Director Brian Dodsworth said: “We’ve responded to a number of asset owners and managers who are committed to having accurate and complete records of the systems within their buildings.

“Our new FEF extension is designed to help seamlessly manage the process, ensuring the right data is collected and shared at the relevant time. Our team has built a service based on extensive research and development to ensure no stone is left unturned, assuring asset owners that they receive full fire and emergency information at handover.

“Our clients understand the supply chain challenges they face, and require a solution provider which can reliably tackle these head-on. This leads them to work with Createmaster to ensure this vital information is available at handover.”

Infrastructure record spend to support 425,000 jobs a year

A record £650bn of public and private investment will be pumped into infrastructure over the next decade, according to the updated Infrastructure Pipeline launched today.

This pipeline includes for the first time the forecasted future workforce demand based on planned investment in projects.

In the more immediate four-year period up to 2024/25, the Infrastructure and Projects Authority estimates over 425,000 individuals will be needed on an average annual basis to deliver planned investment of £200bn as the Government’s Build Back Better efforts get into full swing.

Funding mix of pipeline from 2021/22 to 2024/25 by sector (£’m)

To help suppliers make business-critical decisions as the country emerges from the coronavirus crisis, the Government is also setting out details of £30bn of planned procurements over the next 12 months in social and economic infrastructure.

National Infrastructure and Construction Pipeline spreadsheet

This will create new opportunities for thousands of apprentices, technicians, graduates and skilled workers.

Today’s new Transforming Infrastructure Performance: Roadmap to 2030 also sets out a vision to put digital technology and innovation at the heart of our approach to infrastructure investment and delivery.

This pipeline outlines the extent to which new work will incorporate delivery through Modern Methods of Construction.

Some 170 of the contracts in procurements, worth between £15.4bn and £22.4bn, are planned to include elements delivered by making best use of MMC.

Click here for link Infrastructure Pipeline webpage.

L&G modular homes losses to date reach £137m

Legal and General’s foray into self-delivered modular housing development has seen it accumulate £137m in losses since being set up back in 2016.

Latest accounts for the business reveal that losses last year reached £30.2m, with still no revenue being booked for the venture in 2020, although work started on its first two sites this financial year.

Legal and General Capital Investments continues to support the business as it seeks to invest heavily in plans to revolutionise the housing market with factory-built modular housing.

L&G Modular Homes losses20202019201820172016Pre-tax loss-£30.2-£30.6m-£20.7m-£46.1m-£9.2m

From its factory in Sherburn-in-Elmet in Yorkshire, L&G Modular Homes has its sights on building 3,000 modular homes a year in 2024, bringing ‘rapid and disruptive change’ to house building.

In July this year, the business struck a deal with Peabody-owned Kent housing association to build 153 modular homes.

The deal to acquire a site in Broadstairs for affordable provider Town & Country Housing, brings L&G’s Modular Homes’ factory pipeline to 670 homes including other sites in Selby, Bristol and North Horsham.

L&G said it is aiming now to create up to 300 new jobs by the year-end at its production and logistics business near Leeds to meet the swelling housing pipeline.

The latest scheme, located on Poorhole Lane, will be funded by Homes England, and consists of a range of two, three and four bed houses.

L&G said its modular housing factory offered multi-skilled employment opportunities, including across design, finance, engineering, procurement, construction and production.